GSO Technical Guidelines

To ensure the stability, reliability, and efficiency of the national power grid, GSO provides a suite of technical guidelines for industry stakeholders. These documents serve as authoritative references for Grid-Connected Power Park Module, SCADA integration, Battery Energy Storage Systems (BESS), and other essential technologies. Each guideline outlines the minimum technical requirements, operational standards, and compliance procedures necessary for seamless grid interfacing. Stakeholders are encouraged to review and adhere to these documents to support a secure and coordinated electricity supply system.

Title

GSO SCADA Interfacing Guidelines

Description

This document outlines the SCADA requirements established by the GSO for all users connected to the grid. It details the necessary communication protocols, signal types, hardware and software interfaces, cybersecurity measures, and addressing standards to ensure secure and reliable integration of facility Intelligent Electronic Devices (IEDs) with the GSO’s SCADA Master System. Additionally, it offers guidance on testing procedures, data organization, and control center architecture to enable effective real-time monitoring and control throughout the power grid.

Click to download

Title

GSO EMS Interfacing, Testing and Commissioning Guidelines for CRESS

Description

The document outlines the technical guidelines for interfacing, testing and commissioning renewable energy facilities under the Corporate Renewable Energy Scheme (CRESS). It consists of GSO Energy Management System (EMS) standard requirements for all its automated functions in the system, starting from the signal lists to the signalling logics, as well as the testing procedures.

Click to download

Title

GSO Technical Guide for Grid Connected Power Park Module

Description

The document outlines requirements for power park modules connecting to Malaysia's Grid System, covering essential technical specifications for control systems, data communication, security protocols, and operational capabilities. It ensures safe and reliable integration of power facilities with TNB's grid infrastructure.

Click to download

Title

GSO Testing Guidelines for Grid Connected Power Park Module

Description

The document outlines testing guidelines for grid-connected Power Park Modules in Malaysia, established by GSO. It details technical requirements, testing procedures, and compliance criteria that power facilities must meet before and during commercial operations to ensure grid stability and reliability.

Click to download

Title

GSO Testing Guidelines for Battery Energy Storage System

Description

The document outlines testing guidelines for grid-connected BESS in Malaysia, established by GSO. It details technical requirements, testing procedures, and compliance criteria that power facilities must meet before and during commercial operations to ensure grid stability and reliability.

Click to download

Title

GSO Testing Guidelines for Battery Energy Storage System

Description

The document outlines testing guidelines for grid-connected BESS in Malaysia, established by GSO. It details technical requirements, testing procedures, and compliance criteria that power facilities must meet before and during commercial operations to ensure grid stability and reliability.

Click to download

Title

GSO EMS Interfacing, Testing and Commissioning Guidelines for BESS (Standalone)

Description

This document provides the guidelines regarding interfacing and testing requirements for all upcoming Standalone BESS plants. It consists of GSO Energy Management System (EMS) standard requirements for all its automated functions in the system, starting from the signal lists to the signalling logics, as well as the testing procedures.

Click to download

Title

GSO Technical Guide for Grid Connected Power Park Module

Description

The document outlines requirements for power park modules connecting to Malaysia's Grid System, covering essential technical specifications for control systems, data communication, security protocols, and operational capabilities. It ensures safe and reliable integration of power facilities with TNB's grid infrastructure.

Click to download

Title

GSO Testing Guidelines for Grid Connected Power Park Module

Description

The document outlines testing guidelines for grid-connected Power Park Modules in Malaysia, established by GSO. It details technical requirements, testing procedures, and compliance criteria that power facilities must meet before and during commercial operations to ensure grid stability and reliability.

Click to download

Title

GSO EMS Interfacing, Testing and Commissioning Guidelines for Solar

Description

This document provides the guidelines regarding interfacing and testing requirements for all upcoming solar plants. It consists of GSO Energy Management System (EMS) standard requirements for all its automated functions in the system, starting from the signal lists to the signalling logics, as well as the testing procedures.

Click to download

Title

GSO Technical Guide for Grid Connected Gas Turbine

Description

The document outlines comprehensive technical requirements and standards for gas turbine facilities connecting to the grid system in Peninsular Malaysia. It provides detailed specifications for performance standards, control systems, protection mechanisms, and compliance testing procedures that operators must follow. The document serves as an authoritative reference for power plant operators and technical personnel to ensure safe and efficient integration of gas turbine facilities with the Malaysian grid system.

Click to download

Title

GSO Generator Testing Guidelines in Grid System

Description

This document outlines comprehensive testing procedures and requirements for generators connecting to the grid system in Peninsular Malaysia. The guidelines cover various critical tests including frequency response, fault detection, black start capability, voltage control, and power system stability to ensure safe and reliable integration of generating units with the grid. These testing requirements serve as a standardized framework for verifying generator compliance with the Grid Code and Power Purchase Agreement specifications before commercial operation.

Click to download

For reference on guidelines published by Suruhanjaya Tenaga Malaysia, please refer to their website: https://www.st.gov.my/eng/web/download/listing